| This is the primary settling phase. This phase operates totally in an an-aerobic condition. The design of the primary settling phase separate the floating solids and the settle-able solids. This place also initiates the anaerobic digestion. The middle-cut will be routed through the secondary settling phase. GES have designed the system with a holding capacity for solids. This eliminates the need for a manual or automatic screening | ||
|
||
|
||
|
||
|
||
|
||
|
||
|